Click on the map to change the street view. Street View may not appear if not available through Google Maps.

Coordinates: 27.4475653956672, -80.3944293527457
Project ID: 4461681

INTERCHANGE - ADD LANES

SIS
Lead Agency: MANAGED BY FDOT
From: KINGS HWY
To: EAST OF I-95 SB RAMP
Length: 0.646

Extra Description:

ADD EB RIGHT TURN LANE FROM ORANGE AVE/SR-68 TO I-95 SB ON-RAMP & ADD WB RIGHT-TURN LANE FR ORANGE AVE/SR-68 TO NB KINGS HWY/SR-713. NB & WB PROTECTED RIGHT TURN PHASES TO BE ADDED AT INTERSECTION OF ORANGE AVE/SR-68 AND KINGS HWY/ SR-713. EB TO SB ON-RAMP ENTRANCE TO BE RELOCATED TO THE EXISTING SIGNALIZED INTERSECTION FOR THE WB TO SB (SEE WP45)

Phase Group: P D & E, PRELIMINARY ENGINEERING, RIGHT OF WAY, ENVIRONMENTAL

Contract Class: 1
Item Segment: 1
SIS: Yes
Federal Project: D421 133 B
Component Group: HIGHWAY/ROADWAY/SIDEWALK
Related Key: 4461681
LRTP: Page 8-3
County: ST. LUCIE

Responsible Agency


Agency: MANAGED BY FDOT
Type of Work: 0236

Funding

PhaseFund Code20232024202520262027Total
PEACFP0541,60824,42300 566,031
ROWACFP00382,38600 382,386
ROWDDR00145,51300 145,513
ENVACFP010,000000 10,000
551,608552,322Total: 1,103,930

Prior Year Cost: 55,918

Future Year Cost: 0

Total Project Cost: 1,159,848

LRTP: Page 8-3