Alert
Directions
- 89 Projects
- 6 Comments
Like
Add Comment
Comment
Add A Comment
Respond
Please tell us why you disagree
89 Projects
6 Comments
St. Lucie TPO FY 2022/23 - FY 2026/2027 Draft Transportation Improvement Program (TIP). The TIP provides a prioritized list of all transportation projects in the St. Lucie Planning Area funded from federal and state sources over the next five years. We are collecting feedback on the draft TIP. We would like to hear from you! Please comment on the TIP projects below.
- Performance Charts & Measures
- Map Layers
- Projects
- Highway/Roadway/Sidewalk
- Aviation
- Transit Operations
- Miscellaneous
- Planning
- Bridge
- Turnpike Enterprise
- PAINT BRIDGES - TURNPIKE MAINLINE OVER CR 709 (MP 150.7) (940076, 940951)
BRIDGE - PAINTING
Project Id: 4385501
- PAINT BRIDGES - TURNPIKE MAINLINE OVER RIM DITCH (MP142.2) (940049,940082)
BRIDGE - PAINTING
Project Id: 4385511
- PAINT BRIDGES IN ST. LUCIE COUNTY (940050 @ MP 150.5)(940072 @ MP 152.
BRIDGE - PAINTING
Project Id: 4354101
- TURNPIKE RESURFACING
RESURFACING
From: MP 169.3
To: MP 173
Project Id: 4444021
- TURNPIKE ROADSIDE IMPROVEMENT FROM MP 169.3 - 173
GUARDRAIL
From: MP 169.3
To: MP 173
Project Id: 4444022
- Seaport
Please stay on topic. Comments will not be posted if they are flagrant or contain offensive language.
PAINT BRIDGES IN ST. LUCIE COUNTY (940050 @ MP 150.5)(940072 @ MP 152.
Click on the map to change the street view. Street View may not appear if not available through Google Maps.
Coordinates: 27.37405391, -80.38395882
Project ID: 4354101
Lead Agency: MANAGED BY FDOT
Length: 0.132
Phase Group: PRELIMINARY ENGINEERING, CONSTRUCTION
Contract Class: 7
Item Segment: 1
SIS: Yes
Component Group: BRIDGE
Related Key: 4354101
LRTP: Page 3-9
County: ST. LUCIE
Agency: MANAGED BY FDOT
BRIDGE - PAINTING
SISLead Agency: MANAGED BY FDOT
Length: 0.132
Phase Group: PRELIMINARY ENGINEERING, CONSTRUCTION
Contract Class: 7
Item Segment: 1
SIS: Yes
Component Group: BRIDGE
Related Key: 4354101
LRTP: Page 3-9
County: ST. LUCIE
Responsible Agency
Agency: MANAGED BY FDOT
Funding
Phase | Fund Code | 2023 | 2024 | 2025 | 2026 | 2027 | Total |
---|---|---|---|---|---|---|---|
CST | PKYR | 997,886 | 0 | 0 | 0 | 0 | 997,886 |
997,886 | Total: 997,886 |
Prior Year Cost: 239,956
Future Year Cost: 0
Total Project Cost: 1,237,842
LRTP: Page 3-9