- Projects
- Transportation Systems Management And Safety
- BLAIR STONE RD & NEW VILLAGE AVE INTERSECTION IMPROVEMENTS
INTERSECTION IMPROVEMENT
Project Id: 4476361
- BLUE STAR HWY (SR 10/US 90) FROM W OF BYRD RD TO OPPORTUNITY LN
SIGNING/PAVEMENT MARKINGS
From: W OF BYRD RD
To: OPPORTUNITY LN
Project Id: 4456631
- CR 0346 (VELDA DAIRY RD/OX BOTTOM RD) INTERSECTION REALIGNMENT
Realignment of Ox Bottom Road and Velda Dairy to controlled intersection at Thomasville Road
Project Id: 4538291
- CR 0361 OLD BAINBRIDGE RD AT SR 263 CAPITAL CIRCLE
MISCELLANEOUS CONSTRUCTION
From: CR 0361 OLD BAINBRIDGE RD
To: SR 263 CAPITAL CIRCLE
Project Id: 4406552
- GADSDEN COUNTY MAINT & COMPENSATION OF TRAFFIC SIGNALS ON STATE ROADS
TRAFFIC SIGNALS
Project Id: 4367411
Total Cost: 440,587
- I-10 (SR 8) LEON COUNTY REST AREA TRUCK PARKING AVAILABILITY
REST AREA
Project Id: 4523351
- JEFFERSON COUNTY MAINT & COMPENSATION OF TRAFFIC SIGNALS ON STATE ROADS
TRAFFIC SIGNALS
Project Id: 4367451
Total Cost: 43,651
- LEON COUNTY COMPUTER BASED ATMS IMPLEMENTATION/OPERATIONS
ITS COMMUNICATION SYSTEM
Project Id: 2197852
Total Cost: 2,000,000
- LEON COUNTY MAINT & COMPENSATION OF TRAFFIC SIGNALS ON STATE ROADS
TRAFFIC SIGNALS
Project Id: 4367461
Total Cost: 6,623,669
- TALLAHASSEE FIBER UPGRADES ON CAPITAL CIR, ORANGE AVE, & SPRINGHILL RD
OTHER ITS
Project Id: 4464337
- W TENNESSEE ST (SR 10/US 90) FROM CALIARK ST TO W BREVARD ST
SAFETY PROJECT
From: CALIARK ST
To: W BREVARD ST
Project Id: 4456051
- WAKULLA COUNTY MAINT & COMPENSATION OF TRAFFIC SIGNALS ON STATE ROADS
TRAFFIC SIGNALS
Project Id: 4367511
Total Cost: 186,025
- Aviation
- QUINCY MUNICIPAL AIRPORT CONSTRUCT PERIMETER TAXIWAYS A & B
- QUINCY MUNICIPAL AIRPORT ENVIRON. DESIGN & CONSTRUCTION OF APRON AREA
- QUINCY MUNICIPAL AIRPORT ENVIRONMENTAL/DESIGN OF T-HANGARS & TAXILANE
- QUINCY MUNICIPAL AIRPORT TAXIWAY REHABILITATION - CONSTRUCTION, CEI/RP
- TALLAHASSEE INTERNATIONAL AIRPORT AIR CARRIER APRON IMPROVEMENTS
AVIATION PRESERVATION PROJECT
Project Id: 4500381
- TALLAHASSEE INTERNATIONAL AIRPORT CONSTRUCT AIRFIELD/LIGHTING IMPROVS
AVIATION PRESERVATION PROJECT
Project Id: 4485802
- TALLAHASSEE INTERNATIONAL AIRPORT SECURITY FENCE & GATE REHABILITATION
AVIATION SECURITY PROJECT
Project Id: 4421096
- TALLAHASSEE REGIONAL AIRPORT ACCESS & ROADWAY REALIGNMENT PH II
AVIATION PRESERVATION PROJECT
Project Id: 4160107
- Bicycle and Pedestrian
- BLOXHAM CUTOFF (SR 267) FROM WAKULLA SPRINGS PARK TO ST MARKS TRAIL
BIKE PATH/TRAIL
From: WAKULLA SPRINGS PARK
To: ST MARKS TRAIL
Project Id: 4101722
- CALLEN STREET FROM WALCOTT STREET TO POTTSDAMER STREET
SIDEWALK
From: WALCOTT STREET
To: POTTSDAMER STREET
Project Id: 4512261
- DR. MLK JR MEMORIAL RD FROM REHWINKEL RD TO MALLARD POND CIRCLE
BIKE PATH/TRAIL
From: REHWINKEL RD
To: MALLARD POND CIRCLE
Project Id: 4517251
- PAUL RUSSELL RD SIDEWALK
Five Foot Sidewalk
From: MONDAY RD
To: APALACHEE PKWY/SR 20/US 27
Project Id: 4531411
- SR 63 (US 27) MONROE ST FROM LAKESHORE DRIVE TO JOHN KNOX RD
SIDEWALK
From: LAKESHORE DRIVE
To: JOHN KNOX RD
Project Id: 4450531
- TALLAHASSEE SAFE ROUTES TO SCHOOL - MULTIPLE LOCATIONS
SIDEWALK
Project Id: 4512271
- Bridge and Rail
- SR 20 CROOKED RD BLOUNTSTOWN HWY OVER GUM CREEK BRIDGE NO. 550163
BRIDGE-REPAIR/REHABILITATION
Project Id: 4505501
- SR 377 (US 319) SOPCHOPPY HWY OVER SOPCHOPPY RIVER BRIDGE #590039
BRIDGE-REPAIR/REHABILITATION
Project Id: 4510991
- SR 63 (US 27) OVER OCHLOCKONEE RIVER & RELIEF BR #500124, 25, 26, 27
BRIDGE-REPAIR/REHABILITATION
Project Id: 4510301
- Major Capacity
- CAPITAL CIRCLE SW (SR 263/US 319) FROM CRAWFORDVILLE RD (SR 61) TO SPRINGHILL RD (CR 2203)
ADD LANES & RECONSTRUCT
External Link From: CRAWFORDVILLE RD (SR 61)
To: SPRINGHILL RD (CR 2203)
Project Id: 2197492
Total Cost: 33,162,169
- SR 263 CAPITAL CIRCLE FROM CR 2203 SPRINGHILL RD TO SR 371 ORANGE AVE
ADD LANES & RECONSTRUCT
From: CR 2203 SPRINGHILL RD
To: SR 371 ORANGE AVE
Project Id: 4157829
Total Cost: 86,228,350
- SR 61 & 369 (US 319) FROM WAKULLA ARRAN ROAD TO EAST IVAN ROAD
ADD LANES & RECONSTRUCT
From: WAKULLA ARRAN ROAD
To: EAST IVAN ROAD
Project Id: 4508962
- Resurfacing
- 3RD STREET FROM JEFFERSON AVENUE TO 10TH AVENUE
RESURFACING
From: JEFFERSON AVENUE
To: 10TH AVENUE
Project Id: 4517081
- BLOXHAM CUTOFF RD (SR 267) FROM LEON COUNTY LINE TO WOODVILLE RD (SR 363)
RESURFACING
From: LEON COUNTY LINE
To: WOODVILLE RD (SR 363)
Project Id: 4325502
Total Cost: 12,046,961
- BLUE STAR HWY/WASHINGTON ST (SR 10/US 90) FROM JACKSON COUNTY LINE TO BATES ST
RESURFACING
From: JACKSON COUNTY LINE
To: BATES ST
Project Id: 4134253
Total Cost: 5,307,503
- BOSTON HIGHWAY (CR 149) FROM STILL ROAD TO GILEY ROAD - PHASE II
WIDEN/RESURFACE EXIST LANES
External Link From: STILL ROAD
To: GILEY ROAD
Project Id: 4486132
Total Cost: 2,094,401
- BOSTON HIGHWAY (CR 149) FROM FL/GA PKWY (SR 57/US 319) TO STILL ROAD
WIDEN/RESURFACE EXIST LANES
From: FL/GA PKWY (SR 57/US 319)
To: STILL ROAD
Project Id: 4486131
- CAPITAL CIRCLE NE (SR 261/US 319) FROM APALACHEE PKWY (SR 20/US 27) TO PARK AVE
RESURFACING
From: APALACHEE PKWY (SR 20/US 27)
To: PARK AVE
Project Id: 4287392
Total Cost: 6,900,390
- CAPITAL CIRCLE NW (SR 263) FROM W OF TENNESSEE ST (SR 10/US 90) TO N OF I-10 (SR 8)
RESURFACING
From: W OF TENNESSEE ST (SR 10/US 90)
To: N OF I-10 (SR 8)
Project Id: 2197225
Total Cost: 8,625,083
- COASTAL HWY (SR 30/US 98) FROM W OF WAKULLA RIVER BR TO BLOXHAM CUTOFF RD (SR 267)
RESURFACING
External Link From: WAKULLA RIVER BR
To: BLOXHAM CUTOFF RD (SR 267)
Project Id: 4377562
Total Cost: 6,137,424
- COASTAL HWY (SR 30/US 98) FROM WAKULLA COUNTY LINE TO TAYLOR COUNTY LINE
RESURFACING
From: WAKULLA COUNTY LINE
To: TAYLOR COUNTY LINE
Project Id: 4508171
- CR 12 FAIRBANKS RD FROM CR 157 CONCORD RD TO LEON CO LINE - PHASE II
RESURFACING
From: CR 157 CONCORD RD
To: LEON CO LINE
Project Id: 4466372
- CR 146 ASHVILLE HWY FROM ST MARGARET CHURCH RD TO BASSETT DAIRY RD
WIDEN/RESURFACE EXIST LANES
External Link From: ST MARGARET CHURCH RD
To: BASSETT DAIRY RD
Project Id: 4486051
- CR 158A (OLD LLOYD ROAD) FROM E OF LLOYD CREEK ROAD TO I-10 OVERPASS
RESURFACING
From: E OF LLOYD CREEK ROAD
To: I-10 OVERPASS
Project Id: 4517531
- CR 161A DOGTOWN ROAD FROM CR 161 POINT MILLIGAN RD TO CR 159 SALEM RD
WIDEN/RESURFACE EXIST LANES
From: CR 161 POINT MILLIGAN RD
To: CR 159 SALEM RD
Project Id: 4517731
- CR 274 PROVIDENCE RD FROM CR 65A JUNIPER CREEK RD TO SR 65 HOSFORD HWY
RESURFACING
From: CR 65A JUNIPER CREEK RD
To: SR 65 HOSFORD HWY
Project Id: 4517771
- CRAWFORDVILLE RD (SR 61/ADAMS ST) FROM ARDEN RD TO GAINES ST
RESURFACING
From: ARDEN RD
To: GAINES ST
Project Id: 4508111
- I-10 (SR 8) FROM W OF OLD BAINBRIDGE RD TO W OF OLSON RD
RESURFACING
From: W OF OLD BAINBRIDGE RD
To: W OF OLSON RD
Project Id: 2225896
Total Cost: 27,732,025
- I-10 (SR 8) FROM W OF OLSON RD TO E OF MAHAN DR (SR 10/US 90)
RESURFACING
From: W OF OLSON RD
To: E OF MAHAN DR (SR 10/US 90)
Project Id: 4176432
Total Cost: 18,866,494
- MAHAN DR (SR 10/US 90) FROM CAPITAL CIRCLE NE (SR 263/US 319) TO E OF BUCK LAKE RD (CR 1568)
RESURFACING
From: CAPITAL CIRCLE NE (SR 263/US 319)
To: E OF BUCK LAKE RD (CR 1568)
Project Id: 4269612
Total Cost: 5,978,196
- PAT THOMAS PRKWY (SR 267) FROM LIBERTY COUNTY LINE TO S OF I-10 (SR 8)
RESURFACING
From: LIBERTY COUNTY LINE
To: S OF I-10 (SR 8)
Project Id: 2188452
- S MONROE ST (SR 61) FROM PERKINS ST TO N OF JEFFERSON ST
RESURFACING
From: PERKINS ST
To: N OF JEFFERSON ST
Project Id: 4216354
Total Cost: 5,060,590
- SR 10 (US 90) FROM E OF LONESOME PINE RD TO W OF SR 12
RESURFACING
From: E OF LONESOME PINE RD
To: W OF SR 12
Project Id: 4513441
- SR 10 (US 90) FROM MADISON ST TO W OF QUINCY CREEK
RESURFACING
From: MADISON ST
To: W OF QUINCY CREEK
Project Id: 4508121
- SR 10 (US 90) FROM W OF 4 LANE TO DUVAL STREET
RESURFACING
From: W OF 4 LANE
To: DUVAL STREET
Project Id: 4134252
Total Cost: 14,057,643
- SR 369 (US 319) FROM (US 319) LEON CO LINE TO S OF EAST IVAN ROAD
RESURFACING
From: CAPITAL CIRCLE NE (US 319) NB OFF RAMP
To: LEON COUNTY LINE
Project Id: 4193152
Total Cost: 7,206,139
- SR 63 (US 27) FROM SR 159 TO CR 270 SHADY REST RD
RESURFACING
From: SR 159
To: CR 270 SHADY REST RD
Project Id: 4508091
- STADIUM DRIVE (SR 366) FROM PENSACOLA ST TO GAINES ST
RESURFACING
From: PENSACOLA ST
To: GAINES ST
Project Id: 4491721
- TENNESSEE ST (SR 10/US 90) FROM MONROE ST (SR 61/US 27) TO MAGNOLIA DR (SR 265)
RESURFACING
From: MONROE ST (SR 61/US 27)
To: MAGNOLIA DR (SR 265)
Project Id: 4039423
Total Cost: 12,820,759
- TIGER HAMMACK RD FROM S OF MYSTERIOUS WATERS RD TO SHADEVILLE RD (SR 61)
RESURFACING
External Link From: S OF MYSTERIOUS WATERS RD
To: SHADEVILLE RD (SR 61)
Project Id: 4486191
- W PENSACOLA ST (SR 366) FROM RAILROAD OVERPASS TO STADIUM DR (SR 366)
RESURFACING
Project Id: 2194852
- W TENNESSEE ST (SR 10/US 90) FROM AENON CHURCH RD (CR 1581) TO OCALA RD
RESURFACING
From: AENON CHURCH RD (CR 1581)
To: OCALA RD
Project Id: 4269373
Total Cost: 13,701,095
- WOODVILLE HWY (SR 363) FROM BRIANDAV STREET TO SUNDAY COURT
RESURFACING
From: BRIANDAV STREET
To: SUNDAY COURT
Project Id: 4346701
- Public Transportation
- APALACHEE REGIONAL PLANNING COUNCIL COMMUTER ASSISTANCE
COMMUTER TRANS. ASSISTANCE
Project Id: 4469941
Total Cost: 1,294,240
- BIG BEND TRANSIT - FEDERAL SECTION 5311 CRRSAA OPERATING FUNDING
CAPITAL FOR FIXED ROUTE
Project Id: 4518921
Total Cost: 12,500,000
- BIG BEND TRANSIT - GADSDEN EXPRESS BUS STOPS IMPROVEMENTS
TRANSIT SERVICE DEMONSTRATION
Project Id: 4519991
- BIG BEND TRANSIT COMMUTER ASSISTANCE
COMMUTER TRANS. ASSISTANCE
Project Id: 4203111
Total Cost: 198,559
- BIG BEND TRANSIT COMMUTER ROUTE
COMMUTER TRANS. ASSISTANCE
Project Id: 4222621
Total Cost: 100,000
- CITY OF TALLAHASSEE STARMETRO CAPITAL SECTION 5307
CAPITAL FOR FIXED ROUTE
Project Id: 4222512
Total Cost: 12,011,060
- CITY OF TALLAHASSEE STARMETRO CAPITAL-OPERATING 5310
CAPITAL FOR FIXED ROUTE
Project Id: 4336851
Total Cost: 723,865
- CITY OF TALLAHASSEE STARMETRO OP. FIXED ROUTE 5307
OPERATING FOR FIXED ROUTE
Project Id: 4222513
Total Cost: 19,260,220
- CITY OF TALLAHASSEE STARMETRO SECTION 5339 CAPITAL
CAPITAL FOR FIXED ROUTE
Project Id: 4252699
Total Cost: 2,612,525
- CITY OF TALLAHASSEE TRANSIT NON-URBANIZED AREA 5311
OPERATING/ADMIN. ASSISTANCE
Project Id: 4213643
Total Cost: 3,080,000
- CITY OF TALLAHASSEE TRANSIT OPERATING ASSISTANCE
OPERATING FOR FIXED ROUTE
Project Id: 4222501
Total Cost: 12,935,290
- STARMETRO - FLEX NEIGHBORHOOS CIRCULATOR
TRANSIT SERVICE DEMONSTRATION
Project Id: 4519981
- SUSTAINABLE SOUTHSIDE TRANSIT CENTERFrom: ORANGE AVENUE
Project Id: 4424523
- WAKULLA COUNTY SENIOR CITIZEN TRANSIT NON-URBANIZED AREA 5311
OPERATING/ADMIN. ASSISTANCE
Project Id: 4213663
Total Cost: 2,540,000
- Transportation Planning
- CAPITAL REGION TPA (TALLAHASSEE) FY 2022/2023-2023/2024 UPWP
TRANSPORTATION PLANNING
Project Id: 4393234
Total Cost: 2,512,884
- CAPITAL REGION TPA (TALLAHASSEE) FY 2024/2025-2025/2026 UPWP
TRANSPORTATION PLANNING
Project Id: 4393235
Total Cost: 4,107,365
- CAPITAL REGION TPA (TALLAHASSEE) FY 2026/2027-2027/2028 UPWP
TRANSPORTATION PLANNING
Project Id: 4393236
Total Cost: 5,709,837
- CRTPA CONTINGENCY BOX FOR CRTPA URBAN FUNDS
FUNDING ACTION
Project Id: 2197939
Total Cost: 14,349,499
- CRTPA RESERVE BOX FOR FUTURE PROJECTS USING URBAN FUNDS
FUNDING ACTION
Project Id: 2197935
Total Cost: 14,349,499
- MPO ADVISORY COMMITTEE STAFF FY 2022/2023-2023/2024
TRANSPORTATION PLANNING
Project Id: 4393394
Total Cost: 672,952
- MPO ADVISORY COMMITTEE STAFF FY 2024/2025-2025/2026 UPWP
TRANSPORTATION PLANNING
Project Id: 4393395
Total Cost: 2,018,856
- MPO ADVISORY COMMITTEE STAFF FY 2026/2027-2027/2028 UPWP
TRANSPORTATION PLANNING
Project Id: 4393396
Total Cost: 3,364,760
- Maintenance
- BURNS BLDG - ADA RENOVATIONS - GROUP AND SINGLE USE RESTROOMS - PHASE II
FIXED CAPITAL OUTLAY
Project Id: 4502881
- BURNS BLDG - AUTOMATION UPGRADE
FIXED CAPITAL OUTLAY
Project Id: 4520921
- BURNS BLDG - CENTRAL UTILITY BLDG. COOLING TOWER
FIXED CAPITAL OUTLAY
Project Id: 4520931
- BURNS BLDG - CO HEADQUARTERS - BATHROOM UTILITY
FIXED CAPITAL OUTLAY
Project Id: 4520971
- BURNS BLDG - CO HEADQUARTERS - PARKING GARAGE STUDY
FIXED CAPITAL OUTLAY
Project Id: 4502901
- BURNS BLDG - CO LANDSCAPE AND HARDENING-MASTER CAMPUS PLAN
FIXED CAPITAL OUTLAY
Project Id: 4502892
- BURNS BLDG - SAFETY UPGRADES/MECHANICAL SYSTEM REPLACE - ELEVATOR
FIXED CAPITAL OUTLAY
Project Id: 4482691
- BURNS BLDG - SECURITY-HARDEN MAIN LOBBY, RE-DESIGN, AND RENOVATE
FIXED CAPITAL OUTLAY
Project Id: 4520951
- BURNS BLDG - WORKSTATION REDESIGN AND REPLACEMENT PROJECT
FIXED CAPITAL OUTLAY
Project Id: 4520961
- BURNS BLDG- KITCHEN DECOMMISSIONING AND SPACE RECONFIGURE AND OPTIMIZATION
FIXED CAPITAL OUTLAY
Project Id: 4520941
- BURNS BLDG- LED LIGHTING UPGRADES - INTERIOR
FIXED CAPITAL OUTLAY
Project Id: 4512131
- GREENSBORO ENVIROMENTAL SITE RESTORATION
FIXED CAPITAL OUTLAY
Project Id: 4517611
- MIDWAY OPERATIONS CENTER CONSTRUCT POLE BARN
FIXED CAPITAL OUTLAY
Project Id: 4499561
- MIDWAY OPERATIONS CENTER EMERGENCY GENERATOR COMPONENTS REPLACEMENT
FIXED CAPITAL OUTLAY
Project Id: 4483302
Total Cost: 43,000
- MIDWAY OPERATIONS CENTER HVAC REPLACEMENT
FIXED CAPITAL OUTLAY
Project Id: 4499562
- MIDWAY OPERATIONS CENTER PAINTING INTERIOR
FIXED CAPITAL OUTLAY
Project Id: 4499571
- MIDWAY OPERATIONS CENTER PAINTING/CLEANING EXTERIOR
FIXED CAPITAL OUTLAY
Project Id: 4499581
- MIDWAY OPERATIONS CENTER REMODEL BATHROOM STALL PARTITION/COUNTER TOPS
FIXED CAPITAL OUTLAY
Project Id: 4499591
- MIDWAY OPERATIONS CENTER ROOF REPAIRS
FIXED CAPITAL OUTLAY
Project Id: 4499601
- SPRINGHILL ADMIN BLDG. ROOF REPLACEMENT
FIXED CAPITAL OUTLAY
Project Id: 4482661
- SPRINGHILL ROAD WELDING SHOP ROOF - CO
FIXED CAPITAL OUTLAY
Project Id: 4482662
- TERL LAB ROOF REPLACEMENT-SPRINGHILL ROAD
FIXED CAPITAL OUTLAY
Project Id: 4521001