Project ID: 4522121

ADD RUMBLE STRIPS ADJACENT TO THE MEDIAN AND SHOULDER (FDOT PILOT PROJECT)

SIS
From: E OF KAPTAIN DR
To: MADISON COUNTY LINE
Length: 8.76
Notes:

This project was amended into the FY 23 - FY 27 TIP at the November 15, 2022 CRTPA Board Meeting.

Phase Group: PRELIMINARY ENGINEERING, CONSTRUCTION

Contract Class: 4
Item Segment: 1
SIS: No
Component Group: HIGHWAYS
Related Key: 4367511
LRTP: 2045 RMP Page 5-8 - Table 5-4
County: WAKULLA

Responsible Agency


Agency: RESPONSIBLE AGENCY NOT AVAILABLE
Type of Work: 9917

Funding

PhaseFund Code20232024202520262027Total
PEACSS10,0000000 10,000
CSTACSS127,4730000 127,473
CSTACSS1,3200000 1,320
CSTACSS16,0620000 16,062
154,855Total: 154,855

Prior Year Cost: 0

Future Year Cost: 0

Total Project Cost: 154,855