Coordinates: 27.99668, -81.999103
Project ID: 4449061

ROUNDABOUT

Non-SIS
Lead Agency: MANAGED BY FDOT
Length: 0.372
Phase Group: PRELIMINARY ENGINEERING, RIGHT OF WAY, CONSTRUCTION

Contract Class: 7
Item Segment: 1
SIS: No
Component Group: HIGHWAYS
Related Key: 4449061
LRTP: Pg 4-11
County: POLK

Responsible Agency


Agency: MANAGED BY FDOT
Type of Work: 0235

Funding

PhaseFund Code20242025202620272028Total
CSTDDR3,144,8010000 3,144,801
CSTDIH50,4600000 50,460
CSTDS2,885,5480000 2,885,548
6,080,809Total: 6,080,809

Prior Year Cost: 2,927,232

Future Year Cost: 0

Total Project Cost: 9,008,041

LRTP: Pg 4-11
Anonymous
Roundabout not the best idea with large 18 wheel trucks passing through this way. Also heavy car traffic with general ignorance of how roundabouts work, this is not a good idea. There will be lots of accidents.
Project Comment
Guy
To support the other comment about trucks, there is definitely not enough space to make a roundabout for heavy vehicles. Also the signal under the Polk Parkway would not support the volume of vehicles with a roundabout, the sensor system only let 5 people go through now. It's like they don't want us on the Polk Parkway (to Tampa)
Project Comment
© 2024 PlaceVision Inc | Help | Privacy