- Projects
- Highways
- CENTRAL POLK PARKWAY - FROM POLK PKWY (SR 570) TO US 17 (SR 35)
NEW ROAD CONSTRUCTION
From: POLK PKWY (SR 570)
To: US 17 (SR 35)
Project Id: 4408972
- CENTRAL POLK PARKWAY - FROM US 17 (SR 35) TO SR 60
NEW ROAD CONSTRUCTION
From: US 17 (SR 35)
To: SR 60
Project Id: 4408973
- 10 months 2 weeks ago
-
Anonymous
Eastern leg along Us 27 is needed more
- 10 months, 1 week ago
-
Anonymous
Current variations of the project design don't fully consider the bicycle traffic that crosses SR60 between Connersville Road and 91 Mine Road. Early versions had a traffic light at the intersection and that was changed to a left turn only for E & W bound SR60 traffic. How will cyclists navigate this intersection? Will provisions be made to route traffic to the proposed multi-use trail that is to parallel the Central Polk Parkway? Hopefully consideration is given to non-vehicular traffic and not cut from the "budget" leading to risk of injury or deaths.
- CENTRAL POLK PARKWAY - US 17(SR35) TO SR60
PD&E/EMO STUDY
From: CENTRAL POLK PARKWAY - US 17(SR35)
To: SR60
Project Id: 4408974
- CENTRAL POLK PARKWAY EAST - CR546 TO SOUTH OF US17/92 (4 LNS)
NEW ROAD CONSTRUCTION
From: CR546
To: SOUTH OF US17/92 (4 LNS)
Project Id: 4514201
- CENTRAL POLK PARKWAY EAST - SOUTH OF US17/92 TO SR538
PD&E/EMO STUDY
From: CENTRAL POLK PARKWAY EAST - SOUTH OF US17/92
To: SR538
Project Id: 4514191
- CENTRAL POLK PARKWAY EAST - SR 60 TO US17/92
PD&E/EMO STUDY
Project Id: 4514192
- CENTRAL POLK PARKWAY EAST - SR60 TO US27 (4 LNS)
NEW ROAD CONSTRUCTION
From: SR60
To: SOUTH OF US17/92 (4 LNS)
Project Id: 4514221
- 9 months ago
-
Anonymous
Extend south to connect back to US27 south of Lake Wales
- CENTRAL POLK PARKWAY EAST - US27 TO CR546 (4 LNS)
NEW ROAD CONSTRUCTION
Project Id: 4514211
- 10 months 2 weeks ago
-
Anonymous
NOT NECCESARY! this area is primarily rural low density and a wildlife corridor. We dont want you out here !
- 10 months 2 weeks ago
-
Anonymous
Very necessary to meet state growth requirements not just locally but points south.
- 10 months 2 weeks ago
-
Anonymous
This project is very much needed, US Highway 27 and the roadways around it are oversaturated with traffic
- CENTRAL POLK PARKWAY FEASIBILITY STUDY, FROM SR 60 TO US 17/92
FEASIBILITY STUDY
From: SR 60
To: US 17/92
Project Id: 4428051
- 10 months 2 weeks ago
-
Anonymous
an unbelievably idiotic concept!!! This extension is not needed, causes unnecessary expense to taxpayers and encourages the demise of local agriculture in the pursuit of urban sprawl( and decay!).
- 10 months 2 weeks ago
-
Anonymous
Project is VERY needed. Needs a good tie in point on i4
- 10 months, 1 week ago
-
Brenda Sullivan
Very needed. Wish we could have this expedited to connect to not only I4 but also some point south in Orlando. We need alternate connections to get into Orlando besides I4. Can we get some connections to the toll roads that surround Orlando? Maybe connect to Orange Blossom Trail? John Young Parkway? This insistence on funneling us back up to I4 just keeps creating choke points. Like at Champions Gate - What a mess that is. 27 is turning into the “new championsgate.” Side note - my phone keeps autocorrecting it to “championshate” and it’s not wrong.
- COUNTYLINE RD OVER PEACE RIVER BRIDGE #160101
BRIDGE REPLACEMENT
From: OVER PEACE RIVER BRIDGE
To: OVER PEACE RIVER BRIDGE
Project Id: 4394411
- CR 557 FROM US 17 (SR 92) TO I-4
ADD LANES & RECONSTRUCT
From: US 17 (SR 92)
To: I-4
Project Id: 4451432
- DRAINAGE IMPROVEMENT PROJECT ON SR 17 AT HILLCREST AVE
DRAINAGE IMPROVEMENTS
Project Id: 4463691
- E JOHNSON AVE FROM S 2ND ST TO S 4TH ST
RAIL SAFETY PROJECT
From: S 2ND ST
To: S 4TH ST
Project Id: 4513371
- E TILLMAN AVE FROM S 2ND ST TO S 4TH ST
RAIL SAFETY PROJECT
Project Id: 4513351
- I-4 (SR 400) AT CSX RAILROAD
BRIDGE REPLACEMENT
Project Id: 2012178
- I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION
INTERCHANGE - ADD LANES
Project Id: 4301853
- I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION - FGT
INTERCHANGE - ADD LANES
Project Id: 4301855
- I-4 (SR 400) AT SR 557 (OLD GRADE ROAD)
LANDSCAPING
Project Id: 4402411
- I-4 (SR 400) FROM W OF US 27 (SR 25) TO E OF CR 532
ADD LANES & RECONSTRUCT
From: W OF US 27 (SR 25)
To: E OF CR 532
Project Id: 2012103
- 10 months, 1 week ago
-
Anonymous
The adding of the EB lanes have done little to nothing to get rid of the backups it causes. 429 in BOTH directions is causing the delay. Add 1 or more lanes from the 429 EB to the 417 on ramp will get rid of ALOT of the congestion.
- I-4 AT US 27 (SR 25)
INTERCHANGE - ADD LANES
Project Id: 2012105
- 10 months, 1 week ago
-
Anonymous
Adding lanes from hwy27 to the Champions (chaos) Gate off ramp going EB will be a big help to get rid of congestion and easier flow of traffic.
- 10 months, 1 week ago
-
Anonymous
Additional lanes are needed through this area to Champions gate and beyond to relieve the congestion. It is absurd at the time I spend each week going to and coming from Orlando
- 10 months, 1 week ago
-
Armstrong
As controversial as this suggestion may be, mere the right lane of travel of east bound I-4, before route 27 interchange. This will leave it open for the traffic coming off of route 27. So many people just do not know how to merge so having the right lane open would help move traffic along.
- I-4 REST AREAS IN POLK COUNTY - ADDITIONAL TRUCK PARKING
PARKING FACILITY
Project Id: 4497371
- LOST BRIDGE TRL AT CIRCLE BAR B RANCH TO ACORN LOOP TRL
PD&E/EMO STUDY
From: CIRCLE BAR B RANCH
To: ACORN LOOP TRL
Project Id: 4484341
- SR 25 (US 27) AT SR 60
INTERCHANGE - ADD LANES
Project Id: 4192434
- SR 25 (US 27) AT VARIOUS LOCATIONS
SAFETY PROJECT
Project Id: 4496591
- SR 25 (US 27) FROM CR 630A TO PRESIDENTS DRIVE
ADD LANES & RECONSTRUCT
From: CR 630A
To: PRESIDENTS DRIVE
Project Id: 4192433
- SR 25 (US 27) FROM HIGHLANDS COUNTY LINE TO CR 630A
ADD LANES & RECONSTRUCT
From: HIGHLANDS COUNTY LINE
To: CR 630A
Project Id: 4192432
- SR 25 (US 27) FROM PRESIDENTS DRIVE TO SR 60
ADD LANES & REHABILITATE PVMNT
From: PRESIDENTS DRIVE
To: SR 60
Project Id: 4192435
- SR 35 (US 98) FROM EDGEWOOD DR TO E MAIN STREET
ADD LANES & RECONSTRUCT
From: EDGEWOOD DR
To: E MAIN STREET
Project Id: 1975624
- SR 37 AT CR 640
ROUNDABOUT
Project Id: 4454381
- 10 months 2 weeks ago
-
Nathan Castle
A roundabout here will cause major delays and backups. This intersection is a main interchange for accessing Mosaic mine sites and chemical plants, Streamsong resort, Teco power plants, Duke power plants, Atlantic galvanizer, and surrounding towns and cities (Mulberry, Pine dale, Bradley Jct, Homeland, Fort Meade, Chicora, Duette, Ona, Lithia, Fort Lonesome) Both hwy 37 and hwy 640 see large amount of commercial truck traffic. 37 and 640 are both main routes for Trans phos, New Line Transport, Publix, Walmart, City Furniture, Badcock, Port trucks hauling containers to and from Miami and Tampa ports, Rooms to go, fruit, vegetable, and livestock trucks. Loads ranging from 8' wide to 20'+ wide and overall lengths exceed 100'. 2000 lb vehicles up to 200,000+ lb heavy haul rigs. Roundabouts are not suitable for this type of traffic. With growth on the west coast of FL; traffic volumes on 41, 301, I-75, 39 have all increased drastically, traffic continues to push eastward to avoid the congestion and growth on the west coast, therefore increasing traffic on hwy 37 and 640. I have living in Bradley Jct for 27 years, I use the intersection and those surrounding almost daily (555&640, 630&37, 630&555, 674&37, 674&39, 39&62, 62&37). 37&640 and the intersections listed above have proven for years to be effective for traffic flow even at its busiest times. (5:30am-8am & 2:30pm-6pm) This roundabout will just cause road rage and bring problems for your common motorist and for large commercial vehicles.
- SR 37 FROM ARIANA ST TO LIME ST
MISCELLANEOUS CONSTRUCTION
From: ARIANA ST
To: LIME ST
Project Id: 4446272
- SR 37 FROM ARIANA ST TO LIME ST - PILOT STUDY
MISCELLANEOUS CONSTRUCTION
Project Id: 4446271
- SR 544 (HAVENDALE BLVD NW) AT US 17 (8TH ST NW)
SAFETY PROJECT
Project Id: 4478741
- SR 544 (LUCERNE PARK) FROM MLK BLVD TO AVENUE Y
ADD LANES & RECONSTRUCT
From: MLK BLVD
To: AVENUE Y
Project Id: 4402734
- 10 months, 1 week ago
-
Anonymous
Adding a center turn lane might help traffic flow better. Always lots of traffic from Ave y to MLK. Very hard to to make left turn from Ave Y.
- SR 544 AT DERBY AVE
SAFETY PROJECT
Project Id: 4496551
- SR 559 AT SR 400 (I-4) RAMP SIGNALIZATION
INTERCHANGE IMPROVEMENT
Project Id: 4474362
- 10 months, 1 week ago
-
Timothy Sawyer
This project is desperately needed, particularly with westbound traffic exiting I-4 and going south on 559 to Auburndale the area has grown so fast this is overdue!!
- SR 563 AT PEAR ST / PARKER ST
MEDIAN MODIFICATION
Project Id: 4462741
- SR 572 (DRANE FIELD ROAD) AT WARING ROAD
ROUNDABOUT
Project Id: 4449061
- 10 months, 1 week ago
-
Anonymous
Roundabout not the best idea with large 18 wheel trucks passing through this way. Also heavy car traffic with general ignorance of how roundabouts work, this is not a good idea. There will be lots of accidents.
- 10 months, 1 week ago
-
Guy
To support the other comment about trucks, there is definitely not enough space to make a roundabout for heavy vehicles. Also the signal under the Polk Parkway would not support the volume of vehicles with a roundabout, the sensor system only let 5 people go through now. It's like they don't want us on the Polk Parkway (to Tampa)
- SR 60 OVER PEACE RIVER PAINTING BRIDGE # 160129 AND # 160130
BRIDGE-REPAIR/REHABILITATION
Project Id: 4446431
- SR 600 (US 17/92) DOWNTOWN LAKE ALFRED ONE-WAY PAIR
PD&E/EMO STUDY
Project Id: 4424041
- SR 600 (US 92) FROM COUNTY LINE RD TO WABASH AVE
ADD LANES & RECONSTRUCT
From: COUNTY LINE RD
To: WABASH AVE
Project Id: 4335582
- 10 months 2 weeks ago
-
Anonymous
Please maintain the paved shoulder / bike lane along this roadway with the planned widening. Many people use this corridor for commuting to work via bicycle.
- 10 months, 1 week ago
-
Anonymous
Provide a bike lane or path but separate it from the cars so it's safer
- SR60/MOSAIC FROM BONNIE MINE RD TO MOSAIC ENTRANCE RD
PD&E/EMO STUDY
From: BONNIE MINE RD
To: MOSAIC ENTRANCE RD
Project Id: 4463871
- SR60/MOSAIC FROM BONNIE MINE RD TO MOSAIC ENTRANCE RD
PD&E/EMO STUDY
Project Id: 4463872
- THOMPSON NURSERY RD FROM US 17 TO W LAKE RUBY DR
NEW ROAD CONSTRUCTION
From: US 17
To: W LAKE RUBY DR
Project Id: 4523551
- 10 months 2 weeks ago
-
Anonymous
The widening of Thompson Nursery / Chalet Suzanne needs to extend to Sr17
- US 27 (SR 25) AT SR 60 INTERCHANGE
LANDSCAPING
Project Id: 4336571
- US 27 FROM HIGHLANDS C/L TO N OF SR 60
PD&E/EMO STUDY
From: HIGHLANDS C/L
To: N OF SR 60
Project Id: 4192431
- US 92 MEMORIAL BLVD FROM WALKER AVE TO SR 33 LAKELAND HILLS BLVD
PD&E/EMO STUDY
From: WALKER AVE
To: SR 33 LAKELAND HILLS BLVD
Project Id: 4459301
- Transit
- TPO Planning
- Maintenance
- Turnpike
- Pedestrian/Bicycle
- Aviation
- Rail
- FL Rail Enterprise
- Resurfacing
SR 559 AT SR 400 (I-4) RAMP SIGNALIZATION
INTERCHANGE IMPROVEMENT
SISLead Agency: MANAGED BY FDOT
Length: 0.341
Phase Group: CONSTRUCTION
Contract Class: 7
Item Segment: 2
SIS: Yes
Component Group: HIGHWAYS
Related Key: 4474361
LRTP: page 1-4, 2-3
County: POLK
Responsible Agency
Agency: MANAGED BY FDOT
Funding
Phase | Fund Code | 2024 | 2025 | 2026 | 2027 | 2028 | Total |
---|---|---|---|---|---|---|---|
CST | DDR | 1,269,081 | 0 | 0 | 0 | 0 | 1,269,081 |
CST | DIH | 41,240 | 0 | 0 | 0 | 0 | 41,240 |
1,310,321 | Total: 1,310,321 |
Prior Year Cost: 512,951
Future Year Cost: 0
Total Project Cost: 5,042,262
LRTP: page 1-4, 2-3
This project is desperately needed, particularly with westbound traffic exiting I-4 and going south on 559 to Auburndale the area has grown so fast this is overdue!!