Project ID: 4394391
RESURFACING
Non-SIS
Lead Agency: MANAGED BY FDOT
From: DECASTRO RD
To: JIM KEENE BLVD
Length: 2.027
Phase Group: PRELIMINARY ENGINEERING, CONSTRUCTION


Contract Class: 1

Item Segment: 1

SIS: No

Component Group: HIGHWAYS

Related Key: 4394391

LRTP: Pg 2-5

Responsible Agency



Agency: MANAGED BY FDOT
Type of Work: 0012

Funding

Total
0
0
0
0
0
Total: 0

Prior Year Cost: 0

Future Year Cost: 0

Total Project Cost: 10,378,916

LRTP: Pg 2-5
Anonymous
PLEASE improve the timing of the light at Decastro / 540. In peak traffic it is ridiculous to bring traffic between the 570 expressway and 540 double lane highway to a screeching halt, including weekends, so that one lonely car can go to the landfill. Please try to ensure that traffic going straight is minimally disrupted and the light cycle is not so long
Comment Other
Print (Portrait) Print (Landscape)
© 2019 PlaceVision Inc | Help | Privacy