Community Remarks

FHWA OBLIGATED FUNDING

PROJECT NUMBERPROJECT NAMEDESCRIPTIONLENGTHFUND TOTALFUND CODEPROJECT TOTAL
4513681AVIATION BOULEVARDADD LANES & RECONSTRUCT2.1050CM
0SA0
230879382ND AVE CONSTRUCTIONNEW ROAD CONSTRUCTION50SA
0SL
0ACSM
0GFSN
0SA
1,070,611SN
59,075GFSN
40,632SL
49,706SA
0ACSA1,220,024
4460731TRANS-FLORIDA RAILWAY TRAIL FROM FELLSMERE TO WEST OF I-95 PHASE 1&2BIKE PATH/TRAIL0.000109,613TALL109,613
4456181SR-A1A OVER SEBASTIAN INLET- BRIDGE REPLACEMENTBRIDGE REPLACEMENT1.0587,505NHBR
-600SA
5,170,603NHBR
0ACBR
0ACBR
0GFBR
0NHBR
0ACBR
0ACBR
0ACBR5,177,508
4439961SR-A1A FROM SOUTH OF JASMINE LN TO NORTH OF SR-60/BEACHLAND BLVDRESURFACING1.90096,375SL96,375
4130482SR-9/I-95 @ OSLO ROAD INTERCHANGEINTERCHANGE (NEW)7.37950NHPP
1,000NHPP
1,000SA
-105SA1,945
4476471SR-60 FROM W CR-512 TO W 94TH DRRESURFACING7.339560,080NHRE560,080
4476461US 1 FROM DAVIS STREET TO SOUTH END OF BRIDGE #700224RESURFACING2.054267,771SA267,771
4317241US 1 FROM 53RD STREET TO CR-510ADD LANES & RECONSTRUCT4.3501,022,504SL
78,577SA1,101,081
4315211OSLO ROAD FROM SW 82ND AVE TO 58TH AVENUEADD LANES & RECONSTRUCT2.683381,455SL
749,453SA
678SN
-19,231SA
-3,316TALN
244,869SA
0EB1,353,908
4443141NEW YORK AVENUE FROM NORTH BROADWAY STREET TO WILLOW STREETSIDEWALK0.497-2,842TALT
-61,003SM-63,845
4393275INDIAN RIVER FY 2024/2025-2025/2026 UPWPTRANSPORTATION PLANNING0.000229,283PL
0PL229,283
4393274INDIAN RIVER FY 2022/2023-2023/2024 UPWPTRANSPORTATION PLANNING0.000548,094PL548,094
4377171CR-612 OVER LATERAL CANAL BRIDGE NO. 884024BRIDGE REPLACEMENT0.180107,770SA
174,385NHBR
4,625SA
1,000NHBR
-1,341PROT
5,914,710NHBR6,201,149
4544441CR-510/85TH ST/WABASSO ROAD - FEC RR TO US 1TRAFFIC CONTROL DEVICES/SYSTEM0.116114,348SA114,348
4056063CR-510/85TH ST FROM W OF 82ND AVE TO 58TH AVEADD LANES & RECONSTRUCT3.260327,124TALN
724,605SN
214,058GFSN
199,718GFSL
257,390CARL
167,674SL
-7,972SL
28,516SA
0ACSA1,911,113
4056064CR-510/85TH ST FROM CR-512 TO W OF 82ND AVEADD LANES & RECONSTRUCT2.200544,575SL
496,990SA
28,338GFSL
1,996,325CM
29,929SL
19,650SA
12,870GFSL
-21,590SL3,107,087
4416921CR-510 FROM 58TH AVENUE TO E SR-5/US-1ADD LANES & RECONSTRUCT0.60010,000CM
471,750TALL
37,382SN
665,035SL
460,269SA
20,000GFSL
800,000CM
721,951CARL
0ACSA3,186,387
230879282ND AVENUE FROM 69TH STREET TO CR-510NEW ROAD CONSTRUCTION2.046669SA
-1,675SN-1,006
230879182 AVE FROM 26TH STREET TO CR-510NEW ROAD CONSTRUCTION7.02013,360SA13,360
452995143RD AVENUE SIDEWALKSIDEWALK0.5030TALT0
453327145TH STREET (N GIFFORD ROAD) COMPLETE STREET RETROFITBIKE LANE/SIDEWALK0.9240SA0
4493321I 95/CR 512 INTERCHANGE MODIFICATIONWIDEN/RESURFACE EXIST LANES0.3810ACSA0
4489951TRANS FLORIDA CENTRAL RAILROAD GREENWAYBIKE PATH/TRAIL0.90TALL0
4071902TRANSIT CAPITAL ASSISTANCE (SECTION 5307)PURCHASE VEHICLES/EQUIPMENT00FTA0
4071824TRANSIT OPERATING ASSISTANCE (RURAL)OPERATING/ADMIN. ASSISTANCE00DU0
4457281TRANSIT CAPITAL ASSISTANCE (SECTION 5339)CAPITAL FOR FIXED ROUTE00FTA0
4071906INDIAN RIVER COUNTY BLOCK GRANTOPERATING/ADMIN. ASSISTANCE00FTA0
4393276INDIAN RIVER FY2026/2027-2027/2028 UPWPTRANSPORTATION PLANNING00PL0
4393277INDIAN RIVER FY2028/2029-2029/2030 UPWPTRANSPORTATION PLANNING00PL0
4456182SR A1A RESURFACINGRESURFACING6.550ACPR
0SA
0ACNR0
GRAND TOTAL25,134,275
PlaceVision Inc | Help | Privacy | © 2011-2025. All Rights Reserved.