699_header

Commenting is now closed, thank you for participating

Click on the map to change the street view. Street View may not appear if not available through Google Maps.

Coordinates: 27.28761801772296, -80.4218623594596
Project ID: 4438471

SKID HAZARD OVERLAY

SIS
Lead Agency: MANAGED BY FDOT
From: NORTH OF GATLIN BLVD
To: SOUTH OF ST. LUCIE WEST BLVD
Length: 3.198

Extra Description:

ANTICIPATED NPV=$7,258,112; B/C=2.1;1)LENGTHEN ON-RAMP ACCELERATION LANES (NORTHBOUND ON-RAMP FROMOM GATLIN BLVD.AND SOUTHBOUND ON-RAMP FROMOM ST. LUCIE W. BLVD.) TO COMPLY WITH CURRENT FDOT DESIGN STANDARDS;2)INSTALL A DYNAMIC MESSAGE (DMS) IN THE NORTHBOUND DIRECTION SOUTH OF GATLIN BOULEVARD INTERCHANGE;3)INSTALL CONVENTIONAL ROADWAY LIGHTING;SEE WP45

Phase Group: PRELIMINARY ENGINEERING, CONSTRUCTION, ENVIRONMENTAL

Contract Class: 1
Item Segment: 1
SIS: Yes
Component Group: HIGHWAY/ROADWAY/SIDEWALK
Related Key: 4438471
LRTP: Page 3-9
County: ST. LUCIE

Responsible Agency


Agency: MANAGED BY FDOT
Type of Work: 0216

Funding

PhaseFund Code20242025202620272028Total
CSTDIH28,1650000 28,165
28,165Total: 28,165

Prior Year Cost: 12,857,861

Future Year Cost: 0

Total Project Cost: 12,890,710

LRTP: Page 3-9
© 2024 PlaceVision Inc | Help | Privacy