Project ID: 4461681

INTERCHANGE - ADD LANES

SIS
Lead Agency: MANAGED BY FDOT
From: KINGS HWY
To: EAST OF I-95 SB RAMP
Length: 0.646

Extra Description:

ADD EB RIGHT TURN LANE FROMOM ORANGE AVE/SR-68 TO I-95 SB ON-RAMP & ADD WB RIGHT-TURN LANE FROM ORANGE AVE/SR-68 TO NB KINGS HWY/SR-713 NB & WB PROTECTED RIGHT TURN PHASES TO BE ADDED AT INTERSECTION OF ORANGE AVE/SR-68 AND KINGS HWY/ SR-713 EB TO SB ON-RAMP ENTRANCE TO BE RELOCATED TO THE EXISTING SIGNALIZED INTERSECTION FOR THE WB TO SB (SEE WP45)

Phase Group: P D & E, PRELIMINARY ENGINEERING, RIGHT OF WAY, CONSTRUCTION, ENVIRONMENTAL

Contract Class: 1
Item Segment: 1
SIS: Yes
Federal Project: D421 133 B
Component Group: HIGHWAY/ROADWAY/SIDEWALK
Related Key: 4461681
LRTP: Page 8-3
County: ST. LUCIE

Responsible Agency


Agency: MANAGED BY FDOT
Type of Work: 0236

Funding

PhaseFund Code20242025202620272028Total
PEACFP614,28324,423000 638,706
ROWACFP0382,386000 382,386
ROWDDR0145,513000 145,513
ENVACFP10,0000000 10,000
624,283552,322Total: 1,176,605

Prior Year Cost: 47,172

Future Year Cost: 5,621,289

Total Project Cost: 6,890,984

LRTP: Page 8-3