Alert
Directions
- 153 Projects
- 66 Comments
Like
Add Comment
Comment
Add A Comment
Respond
Please tell us why you disagree
153 Projects
66 Comments
Shown on the map and in the side panel are the TPO's Transportation Improvement Program funded projects from 2023-2027.
- Projects
- Maintenance
- TPO Planning
- Transit
- Highways
- Turnpike
- Pedestrian/Bicycle
- 12TH ST SIDEWALK FROM MELBOURNE AVE TO SMITH RD
SIDEWALK
From: MELBOURNE AVE
To: SMITH RD
Project Id: 4465601
- AVENUE C SE FROM FIRST ST SOUTH TO SECOND ST SE
SIDEWALK
From: FIRST ST SOUTH
To: SECOND ST SE
Project Id: 4484311
- BOONE MIDDLE SW CONN 4 SIDEWALK SEGMENTS @ BOONE MIDDLE SCHOOL
SIDEWALK
Project Id: 4464521
- CHASE STREET TRAIL FROM STRAIN BLVD TO W. OF VETERANS AVE
BIKE PATH/TRAIL
From: STRAIN BLVD
To: W. OF VETERANS AVE
Project Id: 4463181
- COMBEE ACADEMY - SRTS
SIDEWALK
Project Id: 4465491
- CRYSTAL LAKE ELEMENTARY
SIDEWALK
Project Id: 4414811
- FORT FRASER TRAIL EX FROM SR 540(WINTER LAKE RD) TO GLENDALE ST
BIKE PATH/TRAIL
From: SR 540(WINTER LAKE RD)
To: GLENDALE ST
Project Id: 4406031
- HAINES CITY TRAIL PH II GRACE AVE TO CR 544 & RIDGE SCENIC
BIKE PATH/TRAIL
From: GRACE AVE
To: CR 544 & RIDGE SCENIC
Project Id: 4424131
- INWOOD ELEMENTARY - SRTS
SIDEWALK
Project Id: 4442752
- JOSEPHINE ST S/W FROM CENTRAL AVE TO WESTGATE-CENTRAL TRL
SIDEWALK
From: CENTRAL AVE
To: WESTGATE-CENTRAL TRL
Project Id: 4442091
- LAKE HOWARD DR FROM AVE D SW TO 15TH ST SW
BIKE PATH/TRAIL
From: AVE D SW
To: 15TH ST SW
Project Id: 4351091
- LOST BRIDGE TRL AT CIRCLE BAR B RANCH TO ACORN LOOP TRL
PD&E/EMO STUDY
From: CIRCLE BAR B RANCH
To: ACORN LOOP TRL
Project Id: 4484341
- MAINE AVE SIDEWALK FROM COMBEE RD TO PARK ST & IOWA RD TO WANDA WAY
SIDEWALK
From: COMBEE RD, IOWA RD
To: PARK ST, WANDA WAY
Project Id: 4462941
- PROVIDENCE RD FROM SR 539 KATHLEEN RD TO CR 582 GRIFFIN RD
SIDEWALK
From: SR 539 KATHLEEN RD
To: CR 582 GRIFFIN RD
Project Id: 4496601
- SIXTH ST SW FROM S OF AVE G SW TO US 17 (SR 555)
SIDEWALK
From: S OF AVE G SW
To: US 17 (SR 555)
Project Id: 4463651
- SR 544 FROM 42ND STREET NW TO 26TH ST NW
SIDEWALK
From: 42ND STREET NW
To: 26TH ST NW
Project Id: 4465351
- SR 659 (COMBEE RD) FROM US 92 (MEMORIAL BLVD) TO MORGAN COMBEE RD
SIDEWALK
From: US 92 (MEMORIAL BLVD)
To: MORGAN COMBEE RD
Project Id: 4465611
- 1 year 10 months ago
-
Ondrew Hartigan
You've been talking about this project since at least 2017 yet nothing has happened. Combee is only getting busier and these sidewalks are LONG LONG overdue.
- TENOROC TRAIL SEG 2-6 FROM E OF LAKE CRAGO PARK TO BRADDOCK RD
BIKE PATH/TRAIL
From: E OF LAKE CRAGO PARK
To: BRADDOCK RD
Project Id: 4436061
- TENOROC TRL SEGMENT 1 FROM LAKE CRAGO DR TO SR 33 AT OLD COMBEE ROAD
BIKE PATH/TRAIL
From: LAKE CRAGO DR
To: SR 33 AT OLD COMBEE ROAD
Project Id: 4403582
- THREE PARKS TRAIL W FROM CLEVELAND HEIGHTS BLVD TO WESTOVER ST
BIKE PATH/TRAIL
From: CLEVELAND HEIGHTS BLVD
To: WESTOVER ST
Project Id: 4418441
- UPPER PEACE RIVER TR AT VARIOUS LOCATIONS
BIKE PATH/TRAIL
Project Id: 4496951
- US 98 PED PLAZA AT SR 35 (US 98) FROM W. 2ND ST TO W. 5TH ST
PEDESTRIAN SAFETY IMPROVEMENT
From: W. 2ND ST
To: W. 5TH ST
Project Id: 4468141
- Aviation
- Rail
- FL Rail Enterprise
- Resurfacing
- Intersection Improvements
Please stay on topic. Comments will not be posted if they are flagrant or contain offensive language.
JOSEPHINE ST S/W FROM CENTRAL AVE TO WESTGATE-CENTRAL TRL
Click on the map to change the street view. Street View may not appear if not available through Google Maps.
Coordinates: 28.03266149028047, -81.98011101927101
Project ID: 4442091
Lead Agency: MANAGED BY FDOT
From: CENTRAL AVE
To: WESTGATE-CENTRAL TRL
Length: 0.099
Phase Group: PRELIMINARY ENGINEERING, CONSTRUCTION
Contract Class: 5
Item Segment: 1
SIS: No
Federal Project: D120 029 B
Component Group: HIGHWAYS
Related Key: 4442091
LRTP: Pg 4-9
Agency: MANAGED BY FDOT
SIDEWALK
Non-SISLead Agency: MANAGED BY FDOT
From: CENTRAL AVE
To: WESTGATE-CENTRAL TRL
Length: 0.099
Phase Group: PRELIMINARY ENGINEERING, CONSTRUCTION
Contract Class: 5
Item Segment: 1
SIS: No
Federal Project: D120 029 B
Component Group: HIGHWAYS
Related Key: 4442091
LRTP: Pg 4-9
Responsible Agency
Agency: MANAGED BY FDOT
Funding
Phase | Fund Code | 2023 | 2024 | 2025 | 2026 | 2027 | Total |
---|---|---|---|---|---|---|---|
CST | SU | 381,000 | 0 | 0 | 0 | 0 | 381,000 |
381,000 | Total: 381,000 |
Prior Year Cost: 51,000
Future Year Cost: 0
Total Project Cost: 432,000
LRTP: Pg 4-9