Alert
Directions
- 153 Projects
- 66 Comments
Like
Add Comment
Comment
Add A Comment
Respond
Please tell us why you disagree
- Projects
- Maintenance
- TPO Planning
- Transit
- Highways
- COUNTYLINE RD OVER PEACE RIVER BRIDGE #160101
BRIDGE REPLACEMENT
Project Id: 4394411
- I-4 (SR 400) AT CSX RAILROAD
BRIDGE REPLACEMENT
Project Id: 2012178
- I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION
INTERCHANGE - ADD LANES
Project Id: 4301853
- I-4 AT US 27 (SR 25)
INTERCHANGE - ADD LANES
Project Id: 2012105
- 1 year 10 months ago
-
David Elg
Please make this project a priority. The intersection of I-4 and US27 is the most important intersection in all of Polk county, and unfortunately it has become a mess.
- 1 year 10 months ago
-
Anonymous
This should be the number 1 project of priority in polk county if you want to improve roads and transportation! It takes 45 minutes to an hour longer to get past the HWY 27 exit on I-4. You would be wise to move this up from 2027, that’s a ridiculous amount of time to wait on the single worst part of driving in polk county! Please consider implementing the light systems they use in the Atlanta metro area if you can’t move this project up.
- 1 year 10 months ago
-
Ramsey
This area is the single largest issue with being a resident of this area. Many of us work for the entertainment/hospitality industry and have very few comparable alternative routes to use for our commute. Residents who can afford to move will begin to do so just to avoid this traffic.
- 1 year 10 months ago
-
Anonymous
Please make this project a priority. By the time 2027 comes around you’ll need to update the roads again anyway! This is the worst part of Polk county and with all the growth this needs to be a top priority or it’s only going to get worse…
- 1 year 10 months ago
-
Anonymous
This project should be started immediately. Traffic is already so bad but you want to wait until 2027? Apparently the powers that be don't have to travel down these roads ...it's a nightmare!!!
- I-4 REST AREAS IN POLK COUNTY - ADDITIONAL TRUCK PARKING
PARKING FACILITY
Project Id: 4497371
- LANDSCAPING I-4 (SR 400) WILDLIFE CROSSING E OF SR 33
LANDSCAPING
Project Id: 4499791
- SAFETY IMPROVEMENTS POLK PARKWAY (SR 589) (MP 8 TO MP 17) POLK COUNTY
GUARDRAIL
From: MP 8
To: MP 17
Project Id: 4496882
- SR 25 (US 27) FROM CR 630A TO PRESIDENTS DRIVE
ADD LANES & RECONSTRUCT
From: CR 630A
To: PRESIDENTS DRIVE
Project Id: 4192433
- SR 25 (US 27) FROM HIGHLANDS COUNTY LINE TO CR 630A
ADD LANES & RECONSTRUCT
From: HIGHLANDS COUNTY LINE
To: CR 630A
Project Id: 4192432
- SR 33 FROM OLD COMBEE RD TO S OF FIRSTPARK BLVD S
ADD LANES & REHABILITATE PVMNT
From: OLD COMBEE RD
To: S OF FIRSTPARK BLVD S
Project Id: 4301854
- SR 35 (US 98) FROM EDGEWOOD DR TO E MAIN STREET
ADD LANES & RECONSTRUCT
From: EDGEWOOD D
To: E MAIN STREET
Project Id: 1975624
- 1 year 10 months ago
-
Micheal Bracewell
I oppose adding lanes to Bartow road in this area, it would negatively impact those in the neighborhoods on either side. Improved/wider sidewalks are needed, however.
- SR 35 (US 98) FROM N OF WEST SOCRUM LOOP RD TO S OF CR 54
PD&E/EMO STUDY
From: N OF WEST SOCRUM LOOP RD
To: S OF CR 54
Project Id: 4366731
- 1 year 10 months ago
-
Anonymous
Greatly needed .....more trucks and cars using 98 to bypass i4. Will be a major improvement
- SR 544 (HAVENDALE BLVD NW) AT US 17 (8TH ST NW)
SAFETY PROJECT
Project Id: 4478741
- SR 563 FROM ARIANNA ST TO LIME ST
PD&E/EMO STUDY
From: ARIANNA ST
To: LIME ST
Project Id: 4470752
- SR 572 (DRANE FIELD ROAD) AT WARING ROAD
ROUNDABOUT
Project Id: 4449061
- 1 year 10 months ago
-
Micheal Bracewell
I pass through this intersection every day on the way to work and I think this would be a great place for a roundabout. The intersection of N parkway frontage Rd with Waring should also be turned into a roundabout turning the whole thing into a dumbbell interchange
- SR 60 OVER PEACE RIVER PAINTING BRIDGE # 160129 AND # 160130
BRIDGE-REPAIR/REHABILITATION
Project Id: 4446431
- SR 600 (US 92) FROM COUNTY LINE RD TO WABASH AVE
ADD LANES & RECONSTRUCT
From: COUNTY LINE RD
To: WABASH AVE
Project Id: 4335582
- SR 700 (US 98) PEACE RIVER-FT MEADE AT BR # 0064 (JOHN SINGLETARY BR)
BRIDGE REPLACEMENT
Project Id: 4348862
- TAMPA MATERIALS LAB SECURITY
FIXED CAPITAL OUTLAY
Project Id: 4500351
- US 92 MEMORIAL BLVD FROM WALKER AVE TO SR 33 LAKELAND HILLS BLVD
PD&E/EMO STUDY
From: WALKER AVE
To: SR 33 LAKELAND HILLS BLVD
Project Id: 4459301
- WINTER HAVEN INTERMODAL AREA ACCESS IMPROVEMENT: POLLARD RD EXTENSION
ADD LANES & RECONSTRUCT
Project Id: 4495461
- Turnpike
- Pedestrian/Bicycle
- Aviation
- Rail
- FL Rail Enterprise
- Resurfacing
- Intersection Improvements
SR 25 (US 27) FROM HIGHLANDS COUNTY LINE TO CR 630A
Click on the map to change the street view. Street View may not appear if not available through Google Maps.
ADD LANES & RECONSTRUCT
SISLead Agency: MANAGED BY FDOT
From: HIGHLANDS COUNTY LINE
To: CR 630A
Length: 8.758
Phase Group: PRELIMINARY ENGINEERING, RIGHT OF WAY, RAILROAD & UTILITIES, ENVIRONMENTAL
Contract Class: 1
Item Segment: 2
SIS: Yes
Component Group: HIGHWAYS
Related Key: 4192431
LRTP: Pg 4-8
Responsible Agency
Agency: MANAGED BY FDOT
Funding
Phase | Fund Code | 2023 | 2024 | 2025 | 2026 | 2027 | Total |
---|---|---|---|---|---|---|---|
ROW | BNIR | 156,801 | 0 | 0 | 0 | 0 | 156,801 |
ROW | DIH | 225,098 | 0 | 0 | 0 | 0 | 225,098 |
RRU | ACFP | 550,000 | 0 | 0 | 0 | 0 | 550,000 |
RRU | BNIR | 3,000,000 | 0 | 0 | 0 | 0 | 3,000,000 |
RRU | LF | 300,000 | 0 | 0 | 0 | 0 | 300,000 |
ENV | ACFP | 0 | 50,000 | 100,000 | 0 | 0 | 150,000 |
4,231,899 | 50,000 | 100,000 | Total: 4,381,899 |
Prior Year Cost: 13,814,785
Future Year Cost: 76,035,579
Total Project Cost: 100,785,170
LRTP: Pg 4-8